GCDD CONSTRUCTION [Main]
Austin, TX
36
Permits on record
19
Addresses
2
Permit types
Permits issued between 2017-01-06 and 2026-05-06.
Austin, TX
Permits issued between 2017-01-06 and 2026-05-06.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Driveway / Sidewalks | 10 | 295 | 161 | 654 |
| Building Permit | 26 | 85 | 32 | 299 |
| Value | permits | Share |
|---|---|---|
| General/Building | 26 | 72.2% |
| Other | 10 | 27.8% |
| Value | permits | Share |
|---|---|---|
| New | 29 | 80.6% |
| Demolition | 3 | 8.3% |
| Addition | 2 | 5.6% |
| Repair | 1 | 2.8% |
| Alteration | 1 | 2.8% |
| Value | permits | Share |
|---|---|---|
| Final | 31 | 86.1% |
| VOID | 2 | 5.6% |
| Expired | 2 | 5.6% |
| Withdrawn | 1 | 2.8% |
19 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,532 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.